Draft Comprehensive Wastewater Management Plan and Draft Environmental Impact Report (DCWMP/DEIR) and Notice of Project Change (NPC)
Table of Contents
Executive Summary with Figures
Draft Transmittal Letter
Glossary of Common Acronyms
Acknowledgements

Volume 1 of 2
    Volume 1 - Report Cover
Chapter 1 - Introduction
Chapter 2 - Summary of Previous Documents
Chapter 3 - Public Participation and Outreach Program
Chapter 4 - Wastewater Treatment and Watershed Evaluations
Chapter 5 - Considerations for Non-Wastewater Nitrogen Management
Chapter 6 - Summary of Environmental Impact Analysis
Chapter 7 - Recommended Plan
Chapter 8 - MEPA Draft Section 61 Findings and Mitigation Measures
Chapter 9 - Notice of Project Change Request

Volume 2 of 2
Volume 2 - Report Cover

LIST OF FIGURES:
F 1-1 Project Location Map
F 1-2 Estimated Existing Wastewater Nitrogen Removal Percentages
F 1-3 Estimated Future Wastewater Nitrogen Removal Percentages
F 2-1 Wastewater Treatment Sites Considered for Alternative Scenarios 1A, 2A, and 3A
F 2-2 Potential Infiltration Sites at the Falmouth Country Club Site
F 4-1 Sewer Service Areas for Phase 1 and 2
F 4-2 Expansion of ENR Treatment at Existing Blacksmith Shop Road Site
F 4-3 New ENR WWTF at the Falmouth Country Club Site
F 4-4 New ENR WWTF at The MMR Site
F 4-5 Otis WWTF Trickling Filter In 1986
F 4-6 Scenario 1C Particle Tracks
F 4-7 Watershed Worksheet No. 1
F 4-8 Conceptual Infiltration Well Layout
F 4-9 Treatment Alternatives and Schematic
F 4-10 Proposed Wastewater Treatment Site
F 4-11 Proposed Ocean Outfall Location
F 4-12 Sludge Management Alternatives
F 4-13 Recommended Plan Facility Locations
F 6-1 Topography Map
F 6-2 Surficial Geology Map
F 6-3 Soils Map
F 6-4 Water Resources and Historic Considerations for Planning Area
F 6-5 Sensitive Habitat Areas
F 6-6 Flood Zone Areas
F 6-7 Open Space and Landuse tor Planning Area
F 6-8 Zoning for Planning Area
F 6-9 Proposed WWTF Site
 
LIST OF APPENDICES:
A 1-1 Town of Falmouth Wastewater and Nitrogen Management Vision
A 1-2 Town of Falmouth CWMP Plan of Study, March 2007
A 1-3 EOEEA Certificate, ENF Comment Letters, and Comment-Response Memo
A 2-2 CCWPC Report, June 2009.
A 3-1 Project Newsletters
A 3-2 Newspaper Clippings
A 3-3 USEPA Urine Diversion Excerpts
A 3-4 Novaquatis on Urine Diversion Technology, March 2007
A 3-5 Town Managers Charge Statement on TAG
A 3-6 Correspondence Outreach and MMR
A 4-1 BSCE Articles on Ocean Outfall Evaluations in the 1970's
A 4-2 Excerpts of Sandwich Draft EIS on Canal Outfall Evaluations
A 4-3 Excerpts Of Otis ANG WWTF Final EIS on Canal Outfall Evaluations
A 4-4 Nitrogen Balance Worksheet for Scenario 3B
A 5-1 Technical Memoranda - Fertilizer Management
A 5-2 Technical Memoranda - Stormwater Management
A 5-3 Technical Memoranda - Nitrogen Attenuation
A 5-4 Technical Memoranda - Inlet Modifications
A 5-5 CCWPC Correspondence
A 8-1 Falmouth Sewer Code for New Silver Beach as Growth Management Example
     
The CWMP
The Comprehensive Wastewater Management Planning (CWMP) Project for the South Coast Watersheds is Falmouth's ongoing project to identify and prioritize sewer service areas for the Little Pond, Great Pond, Green Pond, Bournes Pond, Eel Pond and Waquoit Bay watersheds. We hope you will revisit this site for project updates.



Benefits of Falmouth's Wastewater Projects
- Restore and protect water quality and the quality of life in Falmouth
- Enhance the economic sustainability of our community
- Preserve the beauty and value of our property for future generations